DARNITSKY RAILWAY HIGHWAY BRIDGE

LocationKiev, Ukraine
Completion Date 12.05.2005 - 26.08.2007
CategoryMass Transportation
ClientDogus Holding
Project: Motor & Railroad Bridge Over Dnieper River
Contract Value: $117,382,704
Contract Duration: 27 months
Contract Value: $117,382,704
Contract Duration: 27 months
This is an important bridge for connecting two sides of Kiev and including a railway line. The feet inside the river first placed into solid ground via pile foundations, then the decorative reinforced concrete columns are poured. All formwork systems and the labor for them are provided by our Company. Bridge statics is designed and constructed considering water transportation. The bridge is the symbol of modernizing Kiev.